Can you charge an EV without a driveway in Trafford?
Trafford approved a one-year cable-gully trial in October 2026, but its current resident page explicitly says applications are not open. There is a dedicated enquiry email. Separate guidance about temporary cables must not be treated as permission to install a permanent channel.
Check your postcode and property →Your practical route
What to do next in Trafford
The correct order matters: do not buy a channel or arrange pavement work before the authority confirms the route.
- Enquire about the launchEmail crosspavementev@trafford.gov.uk for the current start date, eligibility, household fee and application instructions. The Executive decision approves a programme; it does not accept your address.
- Check the discount before budgetingThe announcement describes a £500 discount for the first up to 240 eligible applicants. It does not confirm remaining allocations, your final fee or national grant eligibility. Obtain a written household offer.
- Keep temporary cables separateTrafford says cables should not obstruct footways. Its separate guidance covers suitable visible protectors, insurance, same-side parking, removal after use and a recommended maximum 10m route. Unsuitable cables can be removed; these conditions do not authorise pavement excavation.
Official source
Confirm the current council position
The Executive approved a one-year trial on 19 October 2026. The resident page explicitly says trial applications are not currently accepted and footway infrastructure is not currently permitted. Its separate temporary-cable guidance sets safety and liability conditions; it is not gully consent.
Source last checked: 3 November 2026. This independent guide cannot grant highway permission or reserve a parking space.