Dropped kerb · Kent
Kent dropped kerb: cost, rules and application
Kent County Council requires permission before a contractor creates or widens a dropped kerb. Start with district or borough planning evidence, then the county application; the £500 fee does not include construction.
Check a postcode and property →Application route
How to apply for a dropped kerb in Kent
- Resolve planning firstGet planning permission or written confirmation from the district or borough that it is unnecessary. Obtain the property owner’s permission where relevant.
- Prepare and applyRead the council guidance, prepare a site photograph and dimensioned sketch, then use Kent’s application route and pay £500. Additional specialist inspections cost £76 each.
- Wait for the council decisionKent aims to inspect and decide within 28 days of receiving the application and payment. A refusal currently carries a £231 refund.
- Choose a qualified contractorAfter approval, use a contractor with the required NRSWA excavation/reinstatement accreditations and £5 million public-liability cover. Complete the work within the two-year approval period.
Highway consent and construction are separate stages. Ask for comparable quotations and resolve permits, street furniture and utilities before work begins.
Read the official application guidanceQuote-ready
Compare contractors on the same scope
Ask each contractor to price the approved dimensions, highway specification, permits, traffic management, drainage, waste removal, VAT, exclusions, warranty and defect correction.
Check whether the driveway surface itself may need planning permission →
Official sources
Check before paying
Rules and charges change. The council remains responsible for the final decision and quotation.
Sources last checked: 18 October 2026. This page is independent guidance, not permission or professional planning advice.